Skip to content

Udemy – Primavera P6 Project Planning and Scheduling Masterclass 2025-7

8.46 GB
Udemy – Primavera P6 Project Planning and Scheduling Masterclass 2025-7

Download

File password: www.downloadly.ir

About this item

Descriptions

Primavera P6 Project Planning and Scheduling Masterclass, Either you’re completely brand new, or you’ve played around with the Primavera P6 but want to get more comfortable with Primavera P6 Project Management Software. Either way, this course will be great for you. Primavera P6 is the world’s #1 project schedule management software application and this full course is the best way to learn how to use it. In this course, you’ll gain access to premium video lessons that break down the core concepts behind the most popular project schedule management software. These lessons are designed for all type of learners, and they’re comprehensive enough to leave you with a full understanding of each topic.

These lessons are detailed, which means you’ll get a chance to practice everything you learn and build your concepts even as you’re getting to grips with Primavera P6 Professional Project Management software. presented with the instructions to download and install the Primavera P6 professional software (trial version) so that you can practice and learn as needed! I’ll be teaching the course using the latest Primavera P6 professional software, but if you have a previous version, you can still learn to create your project schedules like a pro. I’ll be here for you every step of the way. If you have any questions about the course content or anything related to this topic, you can always post a question in the course discussion area or can also send me a direct message. I want to make this the best course, on how to use the Primavera P6 Professional project management software for your projects. So if there is any way I can improve this course, just let me know and I’ll try to make it happen. In this complete training to the Primavera P6 project management software, you’ll not only learn most of the tools available in Primavera P6, but also learn how to plan, schedule, monitor and control your projects, within your organization, industry or the service sector you are currently working with.

What you’ll learn

  • Earn (16) Project Management Institute, PMI-PMP PDUs
  • All you need to become a capable and professional project scheduler using the Oracle Primavera P6
  • Become one of the top Primavera P6 users in your project team
  • Carry out regular project planning & scheduling tasks faster than ever before
  • Discover how to value your projects by learning Primavera P6 and many other features
  • Earned value management, monitoring projects using S-Curves
  • Managing project risks using primavera p6 professional
  • Learn to build a complete project schedule from scratch

Who this course is for

  • People working on the Projects
  • Managers, Project Management Professionals, Project Schedulers and Planners
  • Anyone, Oracle Primavera P6 software learners

Specificatoin of Primavera P6 Project Planning and Scheduling Masterclass

  • Publisher : Udemy
  • Teacher : Basharat Bhatti
  • Language: English
  • Level : All Levels
  • Lectures : 56
  • Duration : 20 hours and 23 minutes

Content of Primavera P6 Project Planning and Scheduling Masterclass

Primavera P6 Project Planning and Scheduling Masterclass.

Requirements

  • No previous experience with Oracle Primavera P6 required
  • An open mind and a willingness to learn Primavera P6!
  • A laptop, tablet, smartphone or Ipad
  • A good pair of headphones

Pictures

Primavera P6 Project Planning and Scheduling Masterclass.

Sample Clip

Installation Guide

Extract the files and watch with your favorite player

Subtitle : English

Quality: 720

The 2025/7 version has increased the number of lessons by 11 and the duration increased by 3 hours 54 minutes compared to 2025/2.

Download Links

Downloadly

Download Part 1 – 2 GB

Download Part 2 – 2 GB

Download Part 3 – 2 GB

Download Part 4 – 2 GB

Download Part 5 – 479 MB

Rapidgator

Download Part 1 – 2 GB

Download Part 2 – 2 GB

Download Part 3 – 2 GB

Download Part 4 – 2 GB

Download Part 5 – 479 MB

Password file(s): www.downloadly.ir

File size

8.46 GB