Skip to content

Udemy – Introduction to Ethereum Virtual Machine (EVM) 2022-11

Updated August 10, 2026 502 MB
Udemy – Introduction to Ethereum Virtual Machine (EVM) 2022-11

Download

About this item

Description

Introduction to Ethereum Virtual Machine (EVM) course. This course will help you gain a deep understanding of the Ethereum Virtual Machine and understand how it works on the Ethereum blockchain. One of the most important evolutions of Ethereum is the possibility of programming on blockchains. This possibility is provided by using Ethereum virtual machine or EVM. Although many people are familiar with the term EVM, there is a wide lack of understanding of how EVM actually works and how it fits into the overall functionality of the Ethereum blockchain. In addition, many blockchains, second layers and other related systems claim to be EVM compatible. But what does this compatibility mean? Without understanding EVM, we cannot understand EVM compatibility. To understand EVM, we need to understand virtual machines, distributed systems, blockchains, implementation of smart contracts in Ethereum, etc. Therefore, this course covers all these topics. To be clear, this course is not a programming course, but requires a basic understanding of software systems.

What you will learn in this course:

  • Basics of virtual machines
  • Basics of distributed systems
  • Decentralized systems and consensus
  • Blockchain basics
  • Ethereum and its difference with Bitcoin
  • Ethereum accounts and transactions
  • Ethereum Modes – Account Mode and Global Mode
  • How to deploy and call smart contracts in Ethereum?
  • Anatomy of EVM
  • The role of EVM in processing smart contracts
  • The role of EVM in state changes
  • Stack and stack machine
  • Compilation of smart contracts and opcodes
  • What is nance and what are its effects?

This course is suitable for people who:

  • Professionals and analysts with a technical background who want to understand EVM.

Details of the Introduction to Ethereum Virtual Machine (EVM) course

  • Publisher:  Udemy
  • Lecturer:  Sam Ghosh
  • Training level: beginner to advanced
  • Training duration: 1 hour and 5 minutes
  • Number of courses: 47

Course headings

 Introduction to Ethereum Virtual Machine (EVM)

Introduction to Ethereum Virtual Machine (EVM) course prerequisites

  • Basic understanding of software systems.

Course images

Introduction to Ethereum Virtual Machine (EVM)

Sample video of the course

Installation guide

After Extract, view with your favorite Player.

Subtitle: None

Quality: 720p

download link

Download file – 502 MB

File(s) password: www.downloadly.ir

Size

502 MB