Skip to content

Udemy – Complete Primavera P6 Diploma ( Basic &Advanced Level) 2025-8

14.65 GB
Udemy – Complete Primavera P6 Diploma ( Basic &Advanced Level) 2025-8

Download

File password: www.downloadly.ir

About this item

Descriptions

Complete Primavera P6 Diploma ( Basic &Advanced Level), Primavera Full Course (English version) ,we will study next points : how to use primavera Planning Engineer Responsibilities during project time How to Read Projects Documents How to create EPS, Projects, Portfolio Relation between portfolio ,Program and projects How to create WPS ,Activities Activities types Activites Steps Gantt Chart OPtions Bars Options Time Scale options Columns and rows options Progress % How to Calculate progress % Coordination between Departments to calculate progress % How to create Activities List Relations between Activities Full Explanation of All menus and tools of p6. Definition of Roles and Resources Estimation of Resources Qty for Each activity Estimation of Duration types of durations Scheduling properties Apply Actuals and update prgress tools Creation of Baseline Collection Of Work Progress Data How to Analysis Work Data Updating of work schedule. Documents Control Issues & Risks Projects Expenses Reporting and visualiser tool Relation between P6 & Excel and notepad Global Change & user defined fields (UDF) tools Group and Sort & Filter Tools Cost Accounts Cash in & Cash out Calculations S-CUrve Manpower& Resources Histogram Two Week Lookahead Reports Coding system Top-Down Estimation Store Period Performance Financial Periods narrative reports Final Project Reports Printing Hints P6 Tips & Tricks Recovery & Revised Plans Corrective & Protective Actions Earned value managment Tool (EVM)

What you’ll learn

  • How to use Primavera p6 (Full Tools)
  • Planning Engineer Responsibilities during project
  • Creating and updating Project Baseline
  • Earned Value Method (EVM)
  • Revised&Recovery Schedule
  • Reporting and creating Crroctive & Protective Actions
  • Deal with issues & Risks – Documents -Expenses – Resources By Primavera p6
  • Resource Control
  • Using Visualizer Tool
  • How to use primavera for Documents Control
  • Expenses and Budgetting
  • Cash Flow (Cah In+Cash out) and S-Curve Prepration
  • Primavera P6 Layouts/Templates
  • Top Bottom Estimation Method

Who this course is for

  • Fresh Graduated
  • Planning Engineers

Specificatoin of Complete Primavera P6 Diploma ( Basic &Advanced Level)

  • Publisher : Udemy
  • Teacher : Experts House
  • Language: English
  • Level : All Levels
  • Lectures : 42
  • Duration : 40 hours and 23 minutes

Content of Complete Primavera P6 Diploma ( Basic &Advanced Level)

Complete Primavera P6 Diploma ( Basic &Advanced Level)

Requirements

  • No Special Requirements

Pictures

Complete Primavera P6 Diploma ( Basic &Advanced Level)

Sample Clip

Installation Guide

Extract the files and watch with your favorite player

Subtitle : English

Quality: 720

The 2025/8 version has increased the number of lessons by 3 and the duration increased by 1 hours 42 minutes compared to 2025/6.

Download Links

Download Part 1 – 3 GB

Download Part 2 – 3 GB

Download Part 3 – 3 GB

Download Part 4 – 3 GB

Download Part 5 – 2.65 GB

Password file(s): www.downloadly.ir

File size

14.65 GB