Skip to content

Primavera P6 Professional v24.12 x64

176 MB
Primavera P6 Professional v24.12 x64

Download

22.12

File password: www.downloadly.ir

About this item

Description

Oracle’s Primavera P6 product is one of the best, most powerful, most reliable project management, design and implementation programs. This software is a perfect solution for managing projects and designs in any size and size and with any degree of difficulty.

Primavera P6 software is also used to schedule and control various projects. In construction, industrial and software projects where various activities are carried out on a regular basis, this software can also be used to schedule and control the project and to estimate the cost of those projects.

Oracle’s long-standing Primavera P3 product is used in a variety of forms by 25% of the world’s heavy industry. Nearly 40% of general contractors with annual revenues of $ 5-10 million use Primavera. By comparison, the P6 software did not participate in the US CFMA 2008 industry study. Primavera P6 version changes   It’s more about moving from DOS shortcuts to mouse-click icons than the Primavera P3 version.

Features and Features of Primavera P6 Software:

– Having a proper environment for updating and comparing expected and actual status

– Group projects

– Definition of Work Breakdown Structure (WBS)

– Defining and assigning work calendars

– Filter and Organize

– Updating

– Earned Value Indicators

– Reporting

– Make global changes or Global Chang

– Network Definition of Activities

– Defining time constraints (Constraint)

– Definition, allocation and leveling of resources

– Assigning Resource Curve

Defining and allocating inflation at the expense of resource use

– Hammok and WBS activities and…

 

System Requirements 

Operating Systems

Windows 7

Windows 8-8.1

Windows 10 / 11

Recommended Hardware

Pentium 1 GHz or higher

512 MB of ram

500 MB of free hard-disk space

Internet Explorer 5.5 SP2 or higher

Picture

Primavera P6 Professional

Download Links

Download Primavera P6 Professional v24.12 x64


Download Primavera P6 Professional v23.12 x64

Download Primavera P6 Professional Project Management 22.12 x64

Download Primavera P6 Professional Project Management 21.12 x64

Download Primavera P6 Professional Project Management 20.12 x64

Download Primavera P6 Professional Project Management 19.12 x64

Download Primavera P6 Professional 17.7

Download Primavera P6 Professional 16.1

Download Primavera P6 v8.3

File password (s): www.downloadly.ir

Size

176 MB

What is included

  • – Having a proper environment for updating and comparing expected and actual status
  • – Group projects
  • – Definition of Work Breakdown Structure (WBS)
  • – Defining and assigning work calendars
  • – Filter and Organize
  • – Updating
  • – Earned Value Indicators
  • – Reporting
  • – Make global changes or Global Chang
  • – Network Definition of Activities
  • – Defining time constraints (Constraint)
  • – Definition, allocation and leveling of resources
  • – Assigning Resource Curve
  • Defining and allocating inflation at the expense of resource use
  • – Hammok and WBS activities and…

Requirements

  • Operating Systems
  • Windows 7
  • Windows 8-8.1
  • Windows 10 / 11
  • Recommended Hardware
  • Pentium 1 GHz or higher
  • 512 MB of ram
  • 500 MB of free hard-disk space
  • Internet Explorer 5.5 SP2 or higher