Skip to content

GANTT Control VCL 3.0 for XE2-XE10.2

85 MB
GANTT Control VCL 3.0 for XE2-XE10.2

Download

3.0

File password: www.downloadly.ir

About this item

Description

A wide range of tasks and activities can be programmed and displayed using the GANTT Control VCL component. This component targets developers who are looking to expand their software to display interactive, flexible and creative Gantt charts. GANTT Control VCL is fully coded from scratch and offers many features. This component is compatible with Delphi XE2, Delphi XE3, Delphi XE4, Delphi XE5, Delphi XE6, Delphi XE7, Delphi XE8, Delphi 10 Seattle, Delphi 10.1 Berlin and Delphi 10.2 Tokyo and can integrate with VL 32 and 64-bit Windows . This component offers various types of bars with different applications including workbenches, deadlines, text bars that each display a good part of the process and sub-process.

The change in chart is immediately reflected on the chart. Communication between rods is easy. You can undo as many times as you like. You can filter information for specific sections. Zooming in on the chart automatically gives the tables a more partial timing. You can format each cell individually. There is a whole host of graphical controls available for entering data, such as calendars, combo boxes, lists, and more. You can filter information tables by their content. Table information can be displayed hierarchically. There is a feature called Network Charts in this component to show the processes and their interconnectedness, which looks at all the steps involved in the process from the first steps to the last step.

Features of GANTT Control VCL:

  • Different types of bars for the Gantt chart
  • Easy connecting rods
  • View the table and fine-tune the details by zooming in on the chart
  • Infinite undo
  • Instant display of chart changes
  • Ability to filter data
  • Ability to print charts and charts with preview capability
  • Different graphical controls for importing data
  • And …

required system  

GANTT CONTROL 3.0 VCL is compatible with the following development platforms:
Delphi XE2, Delphi XE3, Delphi XE4, Delphi XE5, Delphi XE6, Delphi XE7, Delphi XE8, Delphi 10 Seattle, Delphi 10.1 Berlin and Delphi 10.2 Tokyo

Pictures

GANTT Control VCL

Installation guide

Copy and replace the cracked files in the Crack folder, as appropriate, at the installation location.

download link

Download GANTT_Control_VCL_3.0_for_XE2-XE10.2

File password (s): www.downloadly.ir

Size

85 MB

What is included

  • Different types of bars for the Gantt chart
  • Easy connecting rods
  • View the table and fine-tune the details by zooming in on the chart
  • Infinite undo
  • Instant display of chart changes
  • Ability to filter data
  • Ability to print charts and charts with preview capability
  • Different graphical controls for importing data
  • And …

Requirements

  • GANTT CONTROL 3.0 VCL is compatible with the following development platforms:
  • Delphi XE2, Delphi XE3, Delphi XE4, Delphi XE5, Delphi XE6, Delphi XE7, Delphi XE8, Delphi 10 Seattle, Delphi 10.1 Berlin and Delphi 10.2 Tokyo