ActiveGanttCSW is a collection of beautiful controls to add Gantt charts and advanced scheduling capabilities to C # WPF applications. These controls are practically applicable in the .NET environment and languages ​​that support WPF for user interface design. These controls can be used to build software that deals with Gantt charts and project progress, or schedule-based applications. This component has a clear structure and it is easy to grasp its object-oriented hierarchy. Since this component is based on an object-oriented model, you do not need to learn new concepts to work with.

This component is also capable of designing a tree view for editing and displaying WBS failures. This graph can be used to identify and classify work components so that the overall scope of work can be shown. You can zoom in on infinite Gantt charts and there is no limit to that. Timeline is fully customizable. This component has a grid capability and a complete tool for displaying charts within a specified historical range.

This control displays Gantt charts with multiple Miestons in multiple layers. It is possible to import XML files from Microsoft Project 2003, 2007 and 2010. It supports XPS printing, and its open-source print algorithm is available to developers in C #. Since this component supports Unicode, various languages ​​such as Farsi and Arabic are easily accessible. ActiveGanttCSW is compiled in two modes, open source in C # and available to developers with appropriate documentation.

ActiveGanttCSW Features and Features:

  • Build Gantt charts and add scheduling and scheduling capabilities to .NET applications
  • WPF shaped appearance
  • Ability to create work failure charts or WBS
  • Manage charts in several independent layers
  • Code availability and full documentation
  • XPS print capability
  • And …

required system  

ActiveGanttCSW Gantt Chart / Scheduler Component – WPF

Visual Studio 2010, 2012, 2013, 2015, 2017

Pictures

ActiveGanttCSW

Installation guide

Read the Readme.txt file.

download link

Download ActiveGanttCSW_Gantt_Chart_Scheduler_Component_WPF_v3.2.3

File password (s): www.downloadly.ir

Size

12 MB

What is included

  • Build Gantt charts and add scheduling and scheduling capabilities to .NET applications
  • WPF shaped appearance
  • Ability to create work failure charts or WBS
  • Manage charts in several independent layers
  • Code availability and full documentation
  • XPS print capability
  • And …